![]() Receipts should be retained as expenditure may be subject to auditing (FEEG2001).Ĭareer Opportunities. Students should be prepared to spend up to £100 per group of their own money in relation to the purchase of components for the Part II Semester 2 Group Design Project. Receipts should be retained as expenditure may be subject to auditing (FEEG2001). Students are required to source and purchase their own batteries for the Odometry Exercise in week 6 and should be prepared to spend up to £50 per group of their own money. ![]() A range of standard construction materials are provided to support the design projects within this module, however, students may wish to customise their designs and choose alternative materials at their own cost. These can be purchased for £1.20 (thin softback) or £4.75 (thick hardback), depending on student choice (FEEG2004). Equipment Field equipment and materials: Students are expected to purchase a laboratory note book in which to record laboratory observations which form part of the assessment.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |